Get a Quote

Verification

Progress Monitoring

Repeat scanning that documents what was built, when, and against which revision.

The problem

Progress reporting on most sites is photographic and narrative. It cannot be measured, and it cannot settle a dispute about what existed on a given date.

What we do

Repeat scans on a common control network produce a measured, dated record of the works. Progress can be quantified rather than described, and the record stands up when it is later contested.

Suitable applications

  • Monthly progress reporting
  • Valuation and payment support
  • Programme and delay evidence
  • Client and lender reporting

Process

01

Project discovery

We establish the site, required accuracy, intended use, safety constraints and deliverable.

02

Capture planning

Methodology, scan-position density, site-access plan, control requirements and data management are agreed in writing.

03

Capture

Field capture follows the agreed site and safety procedures, with coverage checked before demobilisation.

04

Processing and quality control

Registration, cleaning and verification are completed with residuals recorded rather than assumed.

05

Delivery and support

Deliverables are issued in the agreed formats with clear file organisation and technical support.

Deliverables

  • Dated point clouds
  • Progress comparison reports
  • Visual progress documentation
  • Navigable milestone record

Supported formats

E57PDFWeb viewer

Final formats are agreed according to project requirements, client software and intended use. We confirm support for a format after testing it against your software.

Accuracy considerations

The value of a comparison sequence depends on control being established at the first scan. Retrofitting control after several visits limits what can be compared.

Project-specific accuracy and methodology are confirmed during scope development. We do not publish a universal accuracy figure, because a single number cannot hold true across every site condition.

Industries served

ConstructionInfrastructureIndustrial

Related project examples

Project Content Placeholder — Replace Before Publishing

Questions

  • Virtual Walkthroughs — Navigable site environments accessible from a browser.
  • Digital Twins — Connected digital representations of buildings and assets that bring spatial data, geometry and operational information into one environment.
  • 3D Reality Capture — End-to-end 3D scanning, point-cloud registration and processing for buildings, structures and indoor environments.