Common challenges
- Racking layouts that have drifted from the drawings
- Clear heights that vary across the shed
- Operations that cannot stop for a survey
- Capacity planning based on estimated volumes
How 3D helps
Capture works around operating hours. Moving plant is removed in processing, and the resulting record supports layout, capacity and clearance decisions.
Typical project workflow
Scope and site review
We establish the deliverable, the tolerance it requires and the constraints of the site.
Capture planning
Access windows, occupancy, safety procedures and control requirements are agreed before mobilisation.
Capture
Field capture within the agreed windows, with coverage verified before leaving site.
Processing and modelling
Registration, quality checks and production of the agreed drawing, model or report.
Handover
Delivery in the agreed formats, with exclusions and assumptions stated explicitly.
Example use case
A distribution centre evaluates a mezzanine. Measured clear heights across the whole floor plate replace a spot-check assumption.
Illustrative scenario, not a completed client project. Replace with verified case studies before publishing.
Possible deliverables
Relevant services
- Digital Twins — Connected digital representations of buildings and assets that bring spatial data, geometry and operational information into one environment.