Common challenges
- Plant environments too congested to measure by hand
- Clearances unknown until installation day
- Shutdown windows too short for a manual survey
- Drawings that predate several equipment changes
How 3D helps
Capture is fast enough to fit inside a shutdown window, and dense enough that clearance and fit questions can be answered afterwards from the data rather than from another visit.
Typical project workflow
Scope and site review
We establish the deliverable, the tolerance it requires and the constraints of the site.
Capture planning
Access windows, occupancy, safety procedures and control requirements are agreed before mobilisation.
Capture
Field capture within the agreed windows, with coverage verified before leaving site.
Processing and modelling
Registration, quality checks and production of the agreed drawing, model or report.
Handover
Delivery in the agreed formats, with exclusions and assumptions stated explicitly.
Example use case
A factory plans a new production line. The captured environment answers the rigging-route and headroom questions before the equipment is ordered.
Illustrative scenario, not a completed client project. Replace with verified case studies before publishing.
Possible deliverables
Relevant services
- Digital Twins — Connected digital representations of buildings and assets that bring spatial data, geometry and operational information into one environment.